Tel:
China Wireline Tool String manufacturer
Baoji Ruixin Energy Equipment Co.,Ltd

Innovation Excellence

Home ProductsWireline Pressure Control Equipment

Transport Skid Wireline Pressure Control Equipment For Transportation

Transport Skid Wireline Pressure Control Equipment For Transportation

    • Transport Skid Wireline Pressure Control Equipment For Transportation
  • Transport Skid Wireline Pressure Control Equipment For Transportation

    Product Details:

    Place of Origin: China Baoji
    Brand Name: Ruixin
    Certification: API
    Model Number: Customized according to customer requirements

    Payment & Shipping Terms:

    Minimum Order Quantity: 1
    Price: USD 1500~
    Packaging Details: Wooden Box
    Delivery Time: 4-8weeks
    Payment Terms: T/T
    Supply Ability: 1 set 3 weeks
    Contact Now
    Detailed Product Description
    Material: Alloy Steel&Nickel Alloy Coonection Type: O&B
    Size: Customized According To Customer Requirements Function: Integrate PCE For Transportation
    Work Pressure: 3k 5k 10k 15k Service: Standard&H2S
    Name: Transport Skid Wireline Pressure Control Equipment
    High Light:

    Transport Skid Wireline Pressure Control Equipment

    ,

    Wireline Transport Skid

    ,

    Transport Skid PCE

                            Transport skid Wireline Pressure Control Equipment

    Ⅰ. Introduction

    The Pump in tee is attached below the BOP,The pump in tee connection thread is used to connect

    the wellhead manifold to provide a path for large flow. NPT thread hole on the other side of the tee

    body is a pressure release valve . After installing the pressure release valve, it can be used for pressure

    relief to ensure safe operation.

     

    II. General Technical Parameters

                                                         OTIS Quick Union

    Bore Work Pressure Service Connection Seal Dia.
    2.5" 5K 10K Std H2S 5"-4ACME 3.5"
    3" 5K H2S 5"-4ACME 3.5"
    3" 10K Std 5"-4ACME 3.5"
    3" 10K Std H2S 5-3/4"-4ACME 4"
    2.5" 15K H2S 5-3/4"-4ACME 4"
    4" 5K 10K Std 6-1/2"-4ACME 4.75"
    3" 15K Std H2S 7-1/2"-4ACME 5.5"
    5" 5K Std H2S 8-1/4"-4ACME 6.188"
    4" 10K Std H2S 8-3/8"-4ACME 5.25"
    5" 5K 10K Std H2S 9"-4ACME 6.75"
    4" 15K Std H2S 9-1/2"-4ACME 6.25"
    6.38" 10K Std H2S 11-1/2"-4ACME 8.25"

                                                            BOWEN Quick Union

    Bore Work Pressure Service Connection Seal Dia.
    2.5" 5K 10K Std H2S 4-3/4"-4ACME 3.75"
    3" 5K 10K Std 4-3/4"-4ACME 3.75"
    3" 5K H2S 4-3/4"-4ACME 3.75"
    3" 5K Std H2S 5-1/2"-4ACME×2 4.375"
    3" 10K Std 5-1/2"-4ACME×2 4.375"
    2.5" 15K Std H2S 6-5/16"-4ACME 4.375"
    3" 10K Std H2S 6-5/16"-4ACME 4.375"
    3" 15K Std H2S 7"-5STUB ACME 4.375"
    4" 5K H2S 7"-5STUB ACME 4.375"
    4" 10K H2S 8-1/4"-4ACME×2 6.0"

     

    Ⅲ. Features

    The Pump in tee is composed of a body, a nonunion plug, a nonunion nut (standard part), a slip and

    a nonunion nut.The body is a pressure member, and the material is 4140,Through forging, tempering

    treatment, mechanical properties test and ultrasonic testing, to ensure that meet the requirements of

    use.The nut and the slips are fixed by the top wire and play the connecting role.

     

    Ⅳ. Assembly &Disassembly

    1.1.Insert the seal into the hole on the body.

    1.2. Place the union plug on the sealing washer, then put the union nut (standard part) on the body,

    tighten the thread, and then install the thread plug on the union plug and tighten it.

    1.3 Installt the O-ring into a slot at one end of the body;

    1.5 Place two slips on the outer circle of the body;

    1.6 Screw on the union nut;

    1.7 Tighten the two jacking wires respectively;

    1.8 Install the plug on the body and tighten it.

     

    Ⅴ. Pressure Testing:

    1. Install the pressure test connector and connect the pressure test line;

    2. Start the pressure test pump to carry out the pressure test. Refer to the specific specifications and

    drawings for the test pressure and time. Fill in the test record card.

    . Daily Maintenance

    1.After use, the O-ring and seal should be replaced;

    2.When not in use, should take the protector and brush the thread with anti-rust oil for storage.

    Welcome to contact us at any time.

    Contact Details
    Baoji Ruixin Energy Equipment Co.,Ltd

    Contact Person: Selina Qiang

    Tel: 86 13571793445

    Send your inquiry directly to us
    Baoji Ruixin Energy Equipment Co.,Ltd
    401B, High-end Equipment Industrial Park, Baoji High-tech Development Zone, Shaanxi Province
    Tel:86-29-89299016
    Mobile Site Privacy Policy China Good Quality Wireline Tool String Supplier. © 2021 rxwirelinetools.com. All Rights Reserved.