Send Message
Tel:
Ruixin Energy Equipmnet
Ruixin Energy Equipmnet

Innovation Excellence

Home ProductsWireline Tool String

Alloy Steel Wireline Tool String Slip Rope Socket QLS Connection

Alloy Steel Wireline Tool String Slip Rope Socket QLS Connection

  • Alloy Steel Wireline Tool String Slip Rope Socket QLS Connection
  • Alloy Steel Wireline Tool String Slip Rope Socket QLS Connection
Alloy Steel Wireline Tool String Slip Rope Socket QLS Connection
Product Details:
Place of Origin: China Baoji
Brand Name: Ruixin
Certification: API
Model Number: 1.5inch 1.875inch 2.25inch 2.5inch
Payment & Shipping Terms:
Minimum Order Quantity: 1
Packaging Details: Wooden Box
Delivery Time: 1 week
Payment Terms: T/T
Supply Ability: 1 week
Contact Now
Detailed Product Description
Name: Alloy Steel Wireline Tool String Slip Rope Socket QLS Size: 1.5inch 1.875inch 2.25inch 2.5inch
Material: Alloy Steel&Nickel Alloy FN: 1.187~1.75inch
Connection: SR,QLS,BLQJ,HDQRJ Application: Slickline& Wireline
Advantage: Simple& Low Maintenance Design
High Light:

Alloy Steel Rope Socket Wireline

,

Rope Socket Slickline Tool String

,

Slip Rope Socket Wireline Tool String

Alloy Steel Wireline Tool String Slip Rope Socket QLS 

 

I. Overview:

Slip Rope Socket plays the role of connecting cable and downhole instrument, and its upper load-bearing part, lower part is lead part, and the top has fishing neck.

II.the common specifications and technical parameters:

Size Applicable tubing Fishing neck Connection PN
1.5" 2-3/8"~2-7/8" 1.375" 15/16UN W*0-*0.*0.*0
1.875" 2-7/8"~3-1/2" 1.75" 1-1/16UN W*0-*0.*0.*0
2.25" 3-1/2"~4-1/2" 1.75" 1-1/16UN W*0-*0.*0.*0
2.5" 4-1/2"以上 2.313" 1-9/16UN W*0-*0.*0.*0

Note: we can supply special specifications according to client's requirements.

III.the use method:

1. firstly, a steel wire rope passes through a rope cap body, slips and a cone;

2. Make a knot in the head of the wire rope;

3. Tighten the top screw and install the slips and weak slips;

4. Lift the wire rope, and install the slips, weak slips and cones into the rope cap body at one time;

5. Connect the lower joint at the body.

IV. Maintenance:

1. Regularly replace check card tile and weak slip with or without damage and deformation;

2. After the wire rope is used for a period of time, the head should be cut off and the rope cap should be made again to avoid the end of the wire rope from being broken due to excessive fatigue.

Contact Details
Ruixin Energy Equipmnet

Contact Person: Selina Qiang

Tel: 86 13571793445

Send your inquiry directly to us
Ruixin Energy Equipmnet
Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province
Tel:00-86-13571793445
Mobile Site Privacy Policy | China Good Quality Wireline Tool String Supplier. © 2021 - 2024 rxwirelinetools.com. All Rights Reserved.