Send Message
Tel:
Ruixin Energy Equipmnet
Ruixin Energy Equipmnet

Innovation Excellence

Home ProductsWireline Pressure Control Equipment

10k Wireline Pressure Control Equipment Alloy Steel Wellhead Flange 2.5 Inch

10k Wireline Pressure Control Equipment Alloy Steel Wellhead Flange 2.5 Inch

  • 10k Wireline Pressure Control Equipment Alloy Steel Wellhead Flange 2.5 Inch
10k Wireline Pressure Control Equipment Alloy Steel Wellhead Flange 2.5 Inch
Product Details:
Place of Origin: China Baoji
Brand Name: Ruixin
Certification: API
Model Number: 2inch-5inch
Payment & Shipping Terms:
Minimum Order Quantity: 1
Packaging Details: Wooden Box
Delivery Time: 2-3 weeks
Payment Terms: T/T
Supply Ability: 1 set 2 weeks
Contact Now
Detailed Product Description
Name: Wireline Wellhead Flange Size: 2inch ID 2.5inch ID 3inch ID 4inch ID 5inch ID
Work Pressure: 3k 5k 10k 15k Connection Type: O&B
Function: Allows For Only The Joint That Was Broken To Be Tested, Without Filling The Whole Lubricator System Material: Alloy Steel&Nickel Alloy
Service: Standard&H2S
High Light:

10k Wireline Pressure Control Equipment

,

Alloy Steel Wellhead Flange

,

2.5 Inch Wellhead Flange

 Wellhead Flange Wireline Pressure Control Equipment Alloy Steel

 

Wireline Wellhead Flange Wireline Pressure Control Equipment

I. Overview

The wellhead flange is used to connect the tubing pin with the wellhead, with the upper part connected to the tubing pin and the lower part

connected to the wellhead. The wellhead flange is connected by bolts and nuts. When in use, the gasket is placed between the sealing surfaces.

After the nut is tightened, the specific pressure on the gasket surface reaches a certain value, and then the gasket is deformed, and the uneven

part on the sealing surface is filled, so that the connection is tight without leakage.

II The Pressure Test:

The wellhead flange shall be periodically tested for compressive strength, and the test pressure shall be 1.5 times of the working pressure.

1. Install the pressure test joint and connect the pressure test pipeline;

2. Start the pressure test pump for pressure test: press it to the test pressure, hold it for 15 minutes without leakage, and fill in the test record card.

III. Routine Maintenance:

1. The pressure test shall be conducted regularly;

2. When temporarily not in use, it should be stored with silk protector.

Welcome to contact us at any time.

10k Wireline Pressure Control Equipment Alloy Steel Wellhead Flange 2.5 Inch 0

Contact Details
Ruixin Energy Equipmnet

Contact Person: Selina Qiang

Tel: 86 13571793445

Send your inquiry directly to us
Ruixin Energy Equipmnet
Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province
Tel:00-86-13571793445
Mobile Site Privacy Policy | China Good Quality Wireline Tool String Supplier. © 2021 - 2024 rxwirelinetools.com. All Rights Reserved.