Place of Origin: | China Baoji |
Brand Name: | Ruixin |
Certification: | API |
Model Number: | 2inch ID 2.5inch ID 3inch ID 5inch ID |
Minimum Order Quantity: | 1 |
---|---|
Packaging Details: | Wooden Box |
Delivery Time: | 3-4 weeks |
Payment Terms: | T/T, Western Union |
Supply Ability: | 1 set 3 weeks |
Application: | Wireline Pressure Control Equipment Duoble Ram BOP Wireline Pressure Control | Material: | Alloy Steel&Nickel Alloy |
---|---|---|---|
Type: | Manual | Size: | 2." ,2.5",3",5" |
Work Pressure: | 5000PSI 10000PSI | Service: | STD&H2S |
Use: | Wireline Operation And Slickline Operation | ||
High Light: | 5000 PSI Double Ram BOP,BOP Wireline Pressure Control Equipment,10000 PSI Wireline Pressure Control Equipment |
5000 PSI Double Ram BOP Wireline Pressure Control Equipment
Wireline Pressure Control Equipment Duoble Ram BOP Wireline Pressure Control
I. Introduction:
Hydraulic Stuffing Box is a surface pressure control equipment using on slickline operation to seal off the wire, and
the sealing of the wire according the rubber seal packing. The BOP plunger of the blowout system is used for the
sealing of the downhole pressure after the wire break.The seal packing are both available with manual and hydraulic
control methods.
The stuffing box consist of Sheave staff, body and control hydraulic cylinder.
II.Parameters :
1.Model:FH16-70-Y
2.WP:70MPa;
3.For Max Wireline:0.16″;
4.Sheave OD:16″(406.4mm);
5.Control Type :Manual & Hydraulic;
6.Connection:5-3/4-4ACME·O type Quick Union;
7.Safe Load:25KN
III.Method of application:
1.The installation of copper sleeve:
(1).Install the copper sleeve into the piston and screw on the Hexagon Socket Set Screws with Flat Point.
(2). Install the O Ring of the piston.
(3). Install the O Ring of the Hydraulic Cylinder.
(4). Install the piston and spring into the hydraulic cylinder, and then screw down the body and Hexagon Socket Set
Screws with Flat Point.
(5). Screw on the quick connector (female) and Packing nut.
2. Insert the wire through the top of the stuffing box.
(1). Insert the wire through the packing nut, piston, copper sleeve, packing, fabric packing and BOP plunger.
(2). Screw on the plunger stop.
3. Screw off the guard screw,lift the sheave guard and install the wire into the groove, lower the sheave guard and
screw down the guard screw.
4. Connected to the top section of the lubricator and screw down the collar. The stuffing box is attached to the top of the
lubricator with a hand union.
IV.Precautions:
1. Please screw down the Hexagon socket set screws with Flat Point after adjusted hydraulic cylinder and bearing clearance.
2.Add the sealing grease to the deep groove ball bearing of the sheave bolt regularly.
3.The sheave bolt have grease it. If there have any lock or abnormality, we need replace new one immediately.
4.The Sheave should be fastened down when storage or ship to avoid bump.
V.Maintenance:
1.We need change the seal packing and BOP plunger after using.
2.If the bearing is lock or abnormality, we need to check and replace a new one.
3.It should be with the thread protector if not use.
Welcome to contact us at any time.
Contact Person: Selina Qiang
Tel: 86 13571793445