Send Message
Tel:
Ruixin Energy Equipmnet
Ruixin Energy Equipmnet

Innovation Excellence

Home ProductsWireline Running Tool

Alloy Steel Wireline Running B Shifting Tool For Slickline

Alloy Steel Wireline Running B Shifting Tool For Slickline

  • Alloy Steel Wireline Running B Shifting Tool For Slickline
  • Alloy Steel Wireline Running B Shifting Tool For Slickline
Alloy Steel Wireline Running B Shifting Tool For Slickline
Product Details:
Place of Origin: China Baoji
Brand Name: Ruixin
Certification: API
Model Number: 2.81inch
Payment & Shipping Terms:
Minimum Order Quantity: 1
Packaging Details: Wooden Box
Delivery Time: 3-4 weeks
Payment Terms: T/T
Supply Ability: 1 set 3 weeks
Contact Now
Detailed Product Description
Name: B Shifting Tool Wireline Running Tool FN: 2.313inch
Service: STD&H2S Connection: SR,QLS,BLQJ,HDQRJ
Application: Slickline Wireline Material: Alloy Steel&Nickel Alloy
High Light:

Alloy Wireline B Shifting Tool

,

Slickline B Shifting Tool

,

B Shifting Wireline And Slickline Tools

B Shifting Tool Wireline Running Tool

I.Introduction:
B Shifting Tool used to place the A and X-type closed sliding sleeves in the open or closed position.
B Shifting Tool which can shift XA, RA, XO, XD, A, C, CB, WB, L and CM-type sliding sleeves.
The selection key can be used as a non-self-release type but released by a shear pin.
B-type self-release tools cannot pass through the first S-type seating joint.
II. Technical parameters:
1. Specification: 2.813";
2. Salvage neck: 2.313";
3. Connection thread: 1-1/16-10UN;
4. Applicable sliding sleeve specification: 2.813".
III Structural features:
B Shifting Tool is composed of upper joint, collet, upper baffle ring, lower key baffle ring, body, spring, steel pin, screw, etc.
Both ends of the key are limited by upper and lower retaining rings, which are sleeved on the collet. When the upper and lower retaining rings are inserted into the collet, pinch the front part of the collet so that the upper and lower retaining rings can pass through the collet smoothly. The spring in the middle plays a role in supporting the key. Role. Finally, the collet is sleeved on the body, and the steel pin is installed and screwed into the upper joint together with the body. After tightening, the tightening screw is installed.
When disassembling, unscrew the body at a time, flush out the steel pins, and remove the key and upper and lower retaining rings. According to the usage, replace the steel pin and spring.
IV. Daily maintenance:
1. Before going down the well, check whether the key can bounce up smoothly, and check the threads at both ends and the fishing neck at the same time.

2. When not in use temporarily, apply grease to the connecting thread and put a protective wire on it.

Welcome to contact us at any time.

Alloy Steel Wireline Running B Shifting Tool For Slickline 0

Contact Details
Ruixin Energy Equipmnet

Contact Person: Selina Qiang

Tel: 86 13571793445

Send your inquiry directly to us
Ruixin Energy Equipmnet
Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province
Tel:00-86-13571793445
Mobile Site Privacy Policy | China Good Quality Wireline Tool String Supplier. © 2021 - 2024 rxwirelinetools.com. All Rights Reserved.