Send Message
Tel:
Ruixin Energy Equipmnet
Ruixin Energy Equipmnet

Innovation Excellence

Home ProductsWireline Running Tool

3.813 Inch B Shifting Slickline Wireline Running Tool Self Release Positioning

3.813 Inch B Shifting Slickline Wireline Running Tool Self Release Positioning

  • 3.813 Inch B Shifting Slickline Wireline Running Tool Self Release Positioning
  • 3.813 Inch B Shifting Slickline Wireline Running Tool Self Release Positioning
3.813 Inch B Shifting Slickline Wireline Running Tool Self Release Positioning
Product Details:
Place of Origin: China Baoji
Brand Name: Ruixin
Certification: API
Model Number: 2.81inch
Payment & Shipping Terms:
Minimum Order Quantity: 1
Packaging Details: Wooden Box
Delivery Time: 3-4 weeks
Payment Terms: T/T
Supply Ability: 1 set 3 weeks
Contact Now
Detailed Product Description
Name: 3.813 Inch B Shifting Tool Wireline Running Tool FN: 3.313inch
Material: Alloy Steel&Nickel Alloy Connection: SR,QLS,BLQJ,HDQRJ
Service: STD&H2S Application: Slickline Wireline
High Light:

B Shifting Slickline Running Tool

,

Self Release Wireline Positioning Tool

,

3.813 Inch Wireline Running Tool

3.813 inch B Shifting Tool Wireline Running Tool

I.Introduction:
B-type self-release positioning tool, used to place the A and X-type closed sliding sleeves in the open or closed position.
B-type self-release positioning tool, which can shift XA, RA, XO, XD, A, C, CB, WB, L and CM-type sliding sleeves.
The selection key can be used as a non-self-release type but released by a shear pin.
B-type self-release tools cannot pass through the first S-type seating joint.
II. Technical parameters:
1. Specification: 3.813";
2. Salvage neck:3.313";
3. Connection thread: 1-9/16-10UN;
4. Applicable sliding sleeve specification: 3.813".
III Structural features:
B-type self-release positioning tool is composed of upper joint, collet, upper baffle ring, lower key baffle ring, body, spring, steel pin, screw, etc.
Both ends of the key are limited by upper and lower retaining rings, which are sleeved on the collet. When the upper and lower retaining rings are inserted into the collet, pinch the front part of the collet so that the upper and lower retaining rings can pass through the collet smoothly. The spring in the middle plays a role in supporting the key. Role. Finally, the collet is sleeved on the body, and the steel pin is installed and screwed into the upper joint together with the body. After tightening, the tightening screw is installed.
IV.Daily maintenance:
1. Before going down the well, check whether the key can bounce up smoothly, and check the threads at both ends and the fishing neck at the same time.

2. When not in use temporarily, apply grease to the connecting thread and put a protective wire on it.

Welcome to contact us at any time.

3.813 Inch B Shifting Slickline Wireline Running Tool Self Release Positioning 0

Contact Details
Ruixin Energy Equipmnet

Contact Person: Selina Qiang

Tel: 86 13571793445

Send your inquiry directly to us
Ruixin Energy Equipmnet
Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province
Tel:00-86-13571793445
Mobile Site Privacy Policy | China Good Quality Wireline Tool String Supplier. © 2021 - 2024 rxwirelinetools.com. All Rights Reserved.