product, with strict quality control Wireline Tool String factories, producing high quality Wireline Tool String products." />
Place of Origin: | China Baoji |
Brand Name: | Ruixin |
Certification: | API Q1 |
Model Number: | 1.5inch 1.75inch,1.875inch 2inch 2.5inch3.0inch,3.5inch,4.0inch,4.5inch. |
Minimum Order Quantity: | 1 |
---|---|
Packaging Details: | Wooden Box |
Delivery Time: | 1 week |
Payment Terms: | T/T, Western Union |
Supply Ability: | 1 set of 1 week |
Material: | Alloy Steel&Nickel Alloy | Size: | 1.25inch~6inch |
---|---|---|---|
Fish Neck: | 1.187inch 1.375inch 1.75inch 2.313inch | Connection: | SR,QLS,BLQJ,HDQRJ |
Use: | Wireline &Slickline | Advantage: | Clear Debris Which Has Settled On Top Of The Subsurface Equipment Preventing Recovery Of The Equipment By Regular Wireline Operations |
I. Introduction:
A double male adapter sub an extension bailer tube are available as optional extras in the event of large volume bailing operations
II. General Technical Parameters
Size | Fishing neck | Connection | PN |
1.5" | 1.375" | 15/16UN | W24-01.01.00 |
1.75" | 1.375" | 15/16UN | W24-01.08.00 |
1.875" | 1.75" | 1-1/16UN | W24-01.07.00 |
2.0" | 1.75" | 1-1/16UN | W24-01.09.00 |
2.5" | 2.313" | 1-1/16UN | W24-01.10.00 |
3.0" | 2.313" | 1-1/16UN | W24-01.11.00 |
3.5" | 2.313" | 1-1/16UN | W24-01.12.00 |
4.0" | 2.313" | 1-1/16UN | W24-01.13.00 |
4.5" | 2.313" | 1-1/16UN | W24-01.14.00 |
Note. More customized parts are available upon request
III. Structural features
The sand pump bailer is composed of upper contact, fishing neck, piston rod, barrel, connector (piece 5), lifting rod, piston, pipe shoe, cylindrical pin, steel ball, seal ring, set screw, etc. See the concrete structure in the figure.
When operating it, lift the upper contact and then the piston rod and piston connected with it will move upward. At this moment, the steel ball also will move upward and the rock waste in the well will be sucked up; when lowering the upper contact, the steel ball will fall in the hole of pipe shoe, and the rock waste sucked up will be blocked by the steel ball and kept in the barrel; suck and release it repeatedly until the barrel is filled up with rock waste, and then take out the tool.
Welcome to contact us at any time.
Contact Person: Selina Qiang
Tel: 86 13571793445